Skip to content

Use Case — Healthcare

Resilience work with retrievable evidence

Healthcare campuses carry standby power obligations, continuous operation, and inspection expectations. GRIDSTROM keeps the project, vendor, and equipment evidence connected so facilities teams can answer questions without reconstructing history.

Operating Context

The environment this work happens in

  • Continuous clinical operation with narrow windows for interruption.
  • Standby and emergency power obligations subject to inspection.
  • Campus growth adding load to existing distribution.
  • Facilities teams supporting many building vintages at once.

The Fragmented-Data Problem

Where the record breaks today

  • Test and inspection records held in binders or per-vendor systems.
  • Capital requests separated from the equipment condition that justified them.
  • Service history changing hands with each contract cycle.
  • No single view of resilience coverage across the campus.

Financial Decision

Where does resilience investment go first, and what does the record need to demonstrate?

Equipment condition and age against clinical criticality.
Installed cost including phasing around clinical operation.
Service and testing obligations after commissioning.
Sequencing across a multi-year capital plan.

Operational Workflow

How the work moves

  1. 01

    Establish the register

    Standby and distribution assets are recorded with condition.

  2. 02

    Prioritize

    Projects reference criticality and condition, not anecdote.

  3. 03

    Approve

    The decision retains reviewers, versions, and supporting evidence.

  4. 04

    Deliver in phases

    Orders and work windows respect clinical operation.

  5. 05

    Test and retain

    Testing evidence stays attached to the asset.

Representative Product Experience

Campus resilience register — Sterling Ridge Medical Center (demonstration data)

Standby and distribution assets with condition, coverage, and evidence state.

Campus resilience register — Sterling Ridge Medical Center (demonstration data)
RecordAssetBuildingConditionEvidence
AST-6011Emergency generator 1Central plantGoodCurrent
AST-6019ATS-3Tower BMonitorCurrent
AST-6027UPS — imaging suiteTower AAttentionUpdate required
PRJ-6104Distribution upgradeTower CApproval routedPacket attached

Records shown are fictional demonstration data. Capabilities are released progressively.

AssetProjectVendorRequestQuoteOrderWork order

Outputs by Role

What each role gets from the same record

Executive

  • Campus-level resilience and capital status
  • Sequenced multi-year plan

Finance / Planning

  • Capital packet with condition evidence attached
  • Commitment tracking by project

Operations

  • Coverage and exception view by building
  • Vendor and testing schedule

Technician

  • Work order with equipment history
  • Structured test and evidence capture

Integration Approach

Connect what is already in place

  • Vendor-neutral intake: existing spreadsheets, ERP exports, monitoring portals, and equipment telemetry are read into a canonical asset record.
  • GRIDSTROM is not the general ledger. ERP and accounting platforms remain systems of record for financial postings.
  • Existing CMMS and building systems remain in place; identifiers align so assets reconcile.
  • Documents and test evidence are stored privately and linked to the asset they describe.

Security & Governance

How access and evidence are handled

Role-based access, least-privilege permissions, and an append-only history for approvals and status changes. Documents and evidence are stored privately, and access is scoped to the organization, project, and role that requires it. Clinical and patient data are out of scope; GRIDSTROM records infrastructure assets, projects, and service activity only.

Measurement

What success could be measured

Metric categories only. Results depend on the organization, its data, and how the work is adopted; no outcome is promised.

Evidence currency

Share of critical assets with current attached evidence.

Coverage clarity

Share of buildings with a complete resilience register.

Response time

Time from exception to dispatched action.

Plan stability

Change between planned and delivered capital sequence.

Next Step

Discuss your use case

Bring the sites, systems, and decisions you are working with. We will walk through how the record would be structured.

Roles served: Executive · Finance / Planning · Operations · Technician