Skip to content

Use Case — Education

Many buildings, one capital record

Districts and campuses manage large, varied building portfolios with constrained staff and public budget cycles. GRIDSTROM keeps projects, vendors, and assets consistent so each budget request is comparable to the last.

Operating Context

The environment this work happens in

  • Many buildings of different age served by a small facilities team.
  • Bond, grant, and general fund cycles with distinct rules.
  • Bus electrification and campus load arriving in the same planning window.
  • Board and community reporting on how funds were used.

The Fragmented-Data Problem

Where the record breaks today

  • Building condition data held separately from energy scope.
  • Grant documentation detached from the project it funded.
  • Vendor service history rebuilt at each contract renewal.
  • No consolidated inventory of installed energy equipment.

Financial Decision

Which buildings and programs receive funding, and how is the request supported?

Funding source rules and eligible scope by project.
Installed cost including electrical and site work.
Operating and service cost carried by the district after installation.
Sequencing across summer and break windows.

Operational Workflow

How the work moves

  1. 01

    Collect requests

    Building needs enter as structured projects.

  2. 02

    Compare

    Scope and cost options are evaluated on the same inputs.

  3. 03

    Approve and document

    Board-ready packets carry their evidence.

  4. 04

    Procure

    Requests, quotes, and orders follow district process.

  5. 05

    Operate

    Assets carry warranty, vendor, and service history.

Representative Product Experience

District capital register — Weller Valley Schools (demonstration data)

Projects and assets across buildings, with funding source retained on the record.

District capital register — Weller Valley Schools (demonstration data)
RecordProjectBuildingFundingStage
PRJ-5201Bus depot chargingTransportation yardGrant programApproval routed
PRJ-5208Rooftop solar studyWeller HighBondScenario review
PRJ-5214Service upgradeRidge ElementaryGeneral fundQuotes received
AST-5320Storage cabinetWeller HighInstalledOperating

Records shown are fictional demonstration data. Capabilities are released progressively.

AssetProjectVendorRequestQuoteOrderWork order

Outputs by Role

What each role gets from the same record

Executive

  • District-wide program status
  • Board-ready summary of decisions

Finance / Planning

  • Funding source tracked per project
  • Approval and variance record

Operations

  • Building asset register
  • Vendor and service scheduling

Partner

  • Structured request with access constraints
  • Order tied to a defined scope

Integration Approach

Connect what is already in place

  • Vendor-neutral intake: existing spreadsheets, ERP exports, monitoring portals, and equipment telemetry are read into a canonical asset record.
  • GRIDSTROM is not the general ledger. ERP and accounting platforms remain systems of record for financial postings.
  • Student information and HR systems are out of scope; only facility and asset data are used.
  • District financial systems remain the record for postings; projects carry cost references.

Security & Governance

How access and evidence are handled

Role-based access, least-privilege permissions, and an append-only history for approvals and status changes. Documents and evidence are stored privately, and access is scoped to the organization, project, and role that requires it. No student or personnel data is collected or stored.

Measurement

What success could be measured

Metric categories only. Results depend on the organization, its data, and how the work is adopted; no outcome is promised.

Request comparability

Share of projects using standard inputs and assumptions.

Funding traceability

Share of projects with source and eligible scope recorded.

Delivery windows

Work completed within scheduled break periods.

Inventory completeness

Share of installed equipment represented in the register.

Next Step

Discuss your use case

Bring the sites, systems, and decisions you are working with. We will walk through how the record would be structured.

Roles served: Executive · Finance / Planning · Operations · Partner